RIDGID Wet Saw Utility Vehicle WS-UV Highly recomend this tile saw |
Bosch tile blade |
The Audience |
Shower surrounded with Hardiebacker and Todd then screwed up wood trim pieces to hold the tile in place |
Most all projects take some beer motivation |
First Row |
Pro-Flex Platinum Latex Fortified Thinset Mortar Works great...Consistency of "peanut butter" |
Shower Floor |
We found a use for painters tape that does not create another project Use painters tape to hold tiles and spacers in place |
The Shower Floor and Bench have heated florring installed |
9" Antique Bell Style Rainfall Shower Faucet purchased from one of our blogs advertisers " efaucets"
Our Master Bathroom Project ( Previous Post)
Start Date December 27th 2010
Estimated Finish Date September 24th 2011
Master Bath Before My job is creating the design "Master Plan" This bathroom is narrow so to open it up we will be removing walls and Shower insert We removed the 1/4 wall to make the shower area larger I decided on a tile shower and glass wall because Todd can make it look beautiful We took out the wall, vanity and pedistal sink and will be inserting a custom vanity ( built by Todd) With double vessel bowls and faucets mounted on the wall Because of the room being narrow for the floor I chose a versailles pattern to give the look of length |
Start Date December 27th 2010
Estimated Finish Date September 24th 2011